Schools:  Seattle Waldorf  |  Overlake Epiphany  |  Seattle Country Day  |  Bertschi - Center  |  Bertschi - North Campus  |  Salmon Bay Autism-Inclusive Playground  |  Concord International Elementary  |  Bush - Lower School  |  Bush - Wayfinding  |  Lake Washington Girl's  |  Northwest  |  Terrace Park Elementary  |  Seattle Waldorf High School  |  Mountlake Terrace High School  |  Jazz Night School  |  Hamlin Robinson School  |  LWGMS-Giddens School  |  Little Mountain Montessori  |  Bertschi Center Addition

The Overlake School

Redmond, Washington

SCOPE OF WORK:
Campus planning and design through construction administration

COMPLETED:

CONSTRUCTION COST:
$15.5 Million

CLIENT:
Overlake School

SUSTAINABILITY:
Green roof, rain-water harvesting for toilet flushing, sustainable finish materials, low flow plumbing fixtures, high efficiency lighting systems pervious paving, rain gardens and infiltration trenches. TLC is LEED certified.

This multi-phased project grew out of an earlier master plan completed by Johnson+Southerland. Three new classroom buildings, two major remodels and a number of smaller additions and remodels were completed over a four year period. These projects improved a total of over 37,000 gross square feet of classroom and support space as well as site improvements to Overlake’s rural campus. The design of these projects required sensitivity to the complexities of Overlake’s program as well as the complexities of the existing physical campus on a sloping site with multiple wetlands. Site sustainability features include open space preservation, a vegetated green roof, storm water catchment systems, raingardens, and native plantings to complement the significant native forest on site. The projects were phased to keep school in session throughout the construction period.